# Outside 147 Cardinal Avenue · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-outside-147-cardinal-avenue-uk

Outside 147 Cardinal Avenue is an EV charging site in Morden, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Outside 147 Cardinal Avenue, SM4 4ST
- **Area:** Morden, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.38997, -0.21801

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 4 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at Outside 147 Cardinal Avenue (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Outside 147 Cardinal Avenue (Char.gy)?

Up to 4 kW AC via Type 2.

### How many charging sockets does Outside 147 Cardinal Avenue (Char.gy) have?

1 charging socket: 1 × 4 kW Type 2.

### Who operates Outside 147 Cardinal Avenue?

Outside 147 Cardinal Avenue is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at Outside 147 Cardinal Avenue (Char.gy)?

A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Outside 147 Cardinal Avenue (Char.gy)?

A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Outside 147 Cardinal Avenue (Char.gy)?

A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Morden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/morden)
- [Cheapest charging in Morden](https://ampmap.co.uk/chargers/united-kingdom/greater-london/morden/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [Outside 109 Tudor Drive · Char.gy](https://ampmap.co.uk/charger/char-gy-outside-109-tudor-drive-uk) - Type 2 5 kW · Outside 109 Tudor Drive
- [Opposite 475 Lynmouth Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-opposite-475-lynmouth-avenue-uk) - Type 2 5 kW · Lynmouth Avenue
- [Grand Drive · Total Energies](https://ampmap.co.uk/charger/total-energies-grand-drive-uk) - Type 2 7 kW, J-1772 4 kW · Opposite 360 Grand Drive
- [165 Seymour Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-165-seymour-avenue-uk) - Type 2 4 kW · Seymour Avenue
- [Hillcross Avenue · SureCharge](https://ampmap.co.uk/charger/surecharge-hillcross-avenue-uk) - Type 2 4 kW · Hillcross Avenue
- [ubitricity Distributed Energy Systems UK Ltd. 274 Hillcross Avenue, Outside No 274](https://ampmap.co.uk/charger/ubitricity-274-hillcross-avenue-outside-no-274-uk) - Ubitricity · Type 2 5 kW · 274 Hillcross Avenue, Outside No 274 · From 45p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-outside-147-cardinal-avenue-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 27 May 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
