# Raby Street · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-raby-street-uk

Raby Street is an EV charging site in Limehouse, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Raby Street, E14 7LX
- **Area:** Limehouse, Greater London, United Kingdom
- **Coordinates (latitude, longitude):** 51.51411, -0.03809
- **Getting there:** C3 Resident Permit Holders Only: Mon - Fri, 08:30 - 17:30

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 5 kW | 1 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at Raby Street (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Raby Street (Char.gy)?

Up to 5 kW AC via Type 2.

### How many charging sockets does Raby Street (Char.gy) have?

1 charging socket: 1 × 5 kW Type 2.

### Who operates Raby Street?

Raby Street is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at Raby Street (Char.gy)?

A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Raby Street (Char.gy)?

A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Raby Street (Char.gy)?

A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Limehouse](https://ampmap.co.uk/chargers/united-kingdom/greater-london/limehouse)
- [Cheapest charging in Limehouse](https://ampmap.co.uk/chargers/united-kingdom/greater-london/limehouse/cheapest)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [ubitricity Distributed Energy Systems UK Ltd. 36 Salmon Lane](https://ampmap.co.uk/charger/ubitricity-36-salmon-lane-uk) - Ubitricity · Type 2 5 kW · 36 Salmon Lane · From 39p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 1 Camdenhurst Street](https://ampmap.co.uk/charger/ubitricity-1-camdenhurst-street-uk) - Ubitricity · Type 2 5 kW · 1 Camdenhurst Street · From 39p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. Flamborough Street side of 16 Salmon Lane](https://ampmap.co.uk/charger/ubitricity-flamborough-street-side-of-16-salmon-lane-uk) - Ubitricity · Type 2 5 kW · Flamborough Street side of 16 Salmon Lane · From 39p/kWh
- [ubitricity Distributed Energy Systems UK Ltd. 20 Flamborough Street](https://ampmap.co.uk/charger/ubitricity-20-flamborough-street-uk) - Ubitricity · Type 2 5 kW · 20 Flamborough Street · From 39p/kWh
- [Flamborough Street · Char.gy](https://ampmap.co.uk/charger/char-gy-flamborough-street-uk) - Type 2 5 kW · Flamborough Street
- [ubitricity Distributed Energy Systems UK Ltd. 34-2 Aston Street](https://ampmap.co.uk/charger/ubitricity-34-2-aston-street-uk) - Ubitricity · Type 2 5 kW · 34-2 Aston Street · From 39p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-raby-street-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 1 Mar 2023).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
