Char.gy · EV charging site
Robin Hood Gardens
Robin Hood Gardens, Blackwall, E14 0HG
Robin Hood Gardens is an EV charging site in Blackwall, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 357 other charging sites are listed within a mile, and the nearest site with 50 kW or more is London, UK - Canary Wharf (Tesla), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 28 Feb 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- D1 Resident Permit Holders Only: Mon - Fri, 08:30 - 17:30
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Robin Hood Gardens (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Robin Hood Gardens (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Robin Hood Gardens (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Robin Hood Gardens?
Robin Hood Gardens is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Robin Hood Gardens (Char.gy)?
London, UK - Canary Wharf (Tesla) is 0.5 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Robin Hood Gardens (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Robin Hood Gardens (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Robin Hood Gardens (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 13 Robin Hood Lane, Robin Hood Lane
- ubitricity Distributed Energy Systems UK Ltd. Robin Hood Lane
- ubitricity Distributed Energy Systems UK Ltd. 295 Poplar High Street, Opp., Poplar High Str
- ubitricity Distributed Energy Systems UK Ltd. Robin Hood Lane, Junc. Mackrow Wald, Robin Ho
- ubitricity Distributed Energy Systems UK Ltd. Robin Hood Lane, Side of 1 Woolmore Street, R
- ubitricity Distributed Energy Systems UK Ltd. 7 Woolmore Street Opp., Woolmore Street
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 13 Robin Hood Lane, Robin Hood Lane · 55p per kWh · 5 kW · 30 yd