Char.gy · EV charging site
The Driftway
The Driftway, Mitcham, CR4 2AH
The Driftway is an EV charging site in Mitcham, Greater London, run by Char.gy. It has a single 4 kW Type 2 socket. 254 other charging sites are listed within a mile, and the nearest site with 50 kW or more is [E-TAXI ONLY] 34 Christchurch Road (BP Pulse), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 27 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Driftway (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Driftway (Char.gy)?
Up to 4 kW AC via Type 2.
How many charging sockets does The Driftway (Char.gy) have?
1 charging socket: 1 × 4 kW Type 2.
Who operates The Driftway?
The Driftway is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to The Driftway (Char.gy)?
[E-TAXI ONLY] 34 Christchurch Road (BP Pulse) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Driftway (Char.gy)?
A 10–80% charge takes about 13h 50m on the 4 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Driftway (Char.gy)?
A 10–80% charge takes about 9h 59m on the 4 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Driftway (Char.gy)?
A 10–80% charge takes about 12h 46m on the 4 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. Road Framfield, Junction With Streatham Road
- Sandy Lane, adjacent to 51 Streatham Road
- St James Road
- ubitricity Distributed Energy Systems UK Ltd. Avenue Gorringe Park, Junction With Streatham
- 72 Framfield Road
- St Barnabas adjacent, to 12 Evendale Road
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Framfield, Junction With Streatham Road · 67p per kWh · 5 kW · 50 yd
- Fastest nearby
- ubitricity Distributed Energy Systems UK Ltd. Road Framfield, Junction With Streatham Road · 5 kW · 50 yd