Char.gy · EV charging site
Tustin Estate
Tustin Estate, New Cross, SE15 1DU
Tustin Estate is an EV charging site in New Cross, Greater London, run by Char.gy. It has a single 5 kW Type 2 socket. 326 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Old Kent Road (InstaVolt Ltd), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Char.gy
- Opening hours
- Not published
- Access
- Public
- Price
- Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh(from Open Charge Map, 3 May 2023)
- Phone (from Open Charge Map)
- 0800 086 9606
- Notes
- Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.
- Getting there
- Permit E-TU
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Tustin Estate (Char.gy)?
The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Tustin Estate (Char.gy)?
Up to 5 kW AC via Type 2.
How many charging sockets does Tustin Estate (Char.gy) have?
1 charging socket: 1 × 5 kW Type 2.
Who operates Tustin Estate?
Tustin Estate is on the Char.gy network. For site issues, the operator lists 0800 086 9606.
Where is the nearest charger with 50 kW or more to Tustin Estate (Char.gy)?
McDonald's Old Kent Road (InstaVolt Ltd) is 0.7 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tustin Estate (Char.gy)?
A 10–80% charge takes about 11h 4m on the 5 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tustin Estate (Char.gy)?
A 10–80% charge takes about 7h 59m on the 5 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tustin Estate (Char.gy)?
A 10–80% charge takes about 10h 13m on the 5 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Opposite 40 Clifton Crescent
- Gervase Street
- Culmore Business Centre
- Culmore Road
- Opposite 28 Clifton Crescent
- ubitricity Distributed Energy Systems UK Ltd. 19 Clifton Crescent
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 19 Clifton Crescent · 56p per kWh · 5 kW · 0.2 mi