# Villa Road · Char.gy

Web page: https://ampmap.co.uk/charger/char-gy-villa-road-uk

Villa Road is an EV charging site in Coventry, run by Char.gy. Its 5 sockets reach up to 22 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Villa Road, CV6 3DB
- **Area:** Coventry, United Kingdom
- **Coordinates (latitude, longitude):** 52.42546, -1.51773

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 4 | Not listed |
| Type 2 | 3 kW | 3 | Not listed |

- **Price:** Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh (from Open Charge Map)

## Site information

- **Operator:** Char.gy
- **Opening hours:** Not published
- **Access:** Public
- **Notes:** Can also be paid with the Octopus Electroverse app, Zap-Pay, Bonnet app, Paua App, or Shell Recharge app. Charge point not fitted with RFID reader or payment terminal.

## Common questions

### How much does it cost to charge at Villa Road (Char.gy)?

The listed price is Day (07:00-00:00): £0.65/kWh Night (00:00-0700): £0.29/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Villa Road (Char.gy)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Villa Road (Char.gy) have?

5 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 3 kW Type 2, 1 × 3 kW Type 2, 1 × 3 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.

### Who operates Villa Road?

Villa Road is on the Char.gy network. For site issues, the operator lists 0800 086 9606.

### How long does a Tesla Model Y Long Range take to charge at Villa Road (Char.gy)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Villa Road (Char.gy)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Villa Road (Char.gy)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Coventry](https://ampmap.co.uk/chargers/united-kingdom/coventry/coventry)
- [Char.gy chargers](https://ampmap.co.uk/networks/char-gy)

## Chargers near this site

- [140 Bulwer Road · Char.gy](https://ampmap.co.uk/charger/char-gy-140-bulwer-road-uk) - Type 2 3 kW · 140 Bulwer Road
- [134 Bulwer Road · Char.gy](https://ampmap.co.uk/charger/char-gy-134-bulwer-road-uk) - Type 2 3 kW · 134 Bulwer Road
- [Lanchester Road · Char.gy](https://ampmap.co.uk/charger/char-gy-lanchester-road-uk) - Type 2 7 kW, Type 2 3 kW · Lanchester Road
- [Capmartin Road Adj to 196 Grangemouth Road · Char.gy](https://ampmap.co.uk/charger/char-gy-capmartin-road-adj-to-196-grangemouth-road-uk) - Type 2 3 kW · Capmartin Road Adj to 196 Grangemouth Road
- [24 Beake Avenue · Char.gy](https://ampmap.co.uk/charger/char-gy-24-beake-avenue-uk) - Type 2 3 kW · 24 Beake Avenue
- [Capmartin Road Adj to 280 Middlemarch Road · Char.gy](https://ampmap.co.uk/charger/char-gy-capmartin-road-adj-to-280-middlemarch-road-uk) - Type 2 3 kW · Capmartin Road Adj to 280 Middlemarch Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/char-gy-villa-road-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 21 Nov 2026).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
