Charge Your Car · EV charging site
23113 Northwest 70th Street
23113 Northwest 70th Street, Blyth, NE24 1XD
23113 Northwest 70th Street is an EV charging site in Blyth, Northumberland, run by Charge Your Car. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Blyth (GeniePoint), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at 23113 Northwest 70th Street (Charge Your Car)?
Up to 50 kW DC via Type 2, CHAdeMO, CCS.
How many charging sockets does 23113 Northwest 70th Street (Charge Your Car) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates 23113 Northwest 70th Street?
23113 Northwest 70th Street is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to 23113 Northwest 70th Street (Charge Your Car)?
Morrisons Blyth (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at 23113 Northwest 70th Street (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at 23113 Northwest 70th Street (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at 23113 Northwest 70th Street (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Blyth
- Morrisons Blyth
- Keel Row
- Blyth Sport Centre Car Park
- Freehold St Car Park
- Blyth Workspace
- Cheapest nearby
- Keel Row · 79p per kWh · 50 kW · 0.3 mi