Charge Your Car · EV charging site
Abraham Moss
140 Crescent Road, Manchester, M8 5UF
Abraham Moss is an EV charging site in Manchester, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and charging is listed as free. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Superstore - Cheetham Hill, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 20 Sept 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Abraham Moss (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Abraham Moss (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Abraham Moss (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Abraham Moss?
Abraham Moss is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Abraham Moss (Charge Your Car)?
Pod Point Tesco Superstore - Cheetham Hill is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Abraham Moss (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Abraham Moss (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Abraham Moss (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Abraham Moss Leisure Centre
- Pod Point Tesco Superstore - Cheetham Hill
- North Manchester Hospital
- North Manchester General Hospital - Outdoor
- Broughton Hub
- Broughton Hub
- Cheapest nearby
- Pod Point Tesco Superstore - Cheetham Hill · 44.4p per kWh · 50 kW · 0.3 mi
- Fastest nearby
- Pod Point Tesco Superstore - Cheetham Hill · 50 kW · 0.3 mi