BP Pulse · EV charging site
Appleton Gate Car-Park
43 Appleton Gate, Newark on Trent, NG24 1JR
Appleton Gate Car-Park is an EV charging site in Newark on Trent, Nottinghamshire, run by BP Pulse. It has a single 50 kW CCS socket, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 47 charging sessions here over the last 30 days. 10 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Morrisons Newark (GeniePoint), 0.1 miles away.
Status
1 of 1 available
Checking status…
Connectors
CCS · 50 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- BP Pulse
- Opening hours
- Not published
- Payment
- In the BP Pulse appRFID card
- Charger ID
- 24679
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 50 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Appleton Gate Car-Park (BP Pulse)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Appleton Gate Car-Park (BP Pulse)?
Up to 50 kW DC via CCS.
How many charging sockets does Appleton Gate Car-Park (BP Pulse) have?
1 charging socket: 1 × 50 kW CCS. Live per-socket availability is shown on this page.
When is Appleton Gate Car-Park (BP Pulse) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 8 am. The live status on this page shows what is free before you set off.
How reliable is Appleton Gate Car-Park (BP Pulse)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 47 observed charging sessions.
Who operates Appleton Gate Car-Park?
Appleton Gate Car-Park is on the BP Pulse network.
Where is the nearest other charger with 50 kW or more to Appleton Gate Car-Park (BP Pulse)?
Morrisons Newark (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Appleton Gate Car-Park (BP Pulse)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Appleton Gate Car-Park (BP Pulse)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Appleton Gate Car-Park (BP Pulse)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Morrisons Newark
- London Road Car Park
- Maltings Retail Park, Newark
- Newark, UK
- Shell Recharge EV Waitrose - Newark
- Northgate Retail Park
- Cheapest nearby
- Newark, UK · 60p per kWh · 250 kW · 0.3 mi
- Fastest nearby
- Newark, UK · 250 kW · 0.3 mi