Charge Your Car · EV charging site
Behind and to LHS of the gatehouse
Mitchell Road, Corby, NN17 5AF
Behind and to LHS of the gatehouse is an EV charging site in Corby, North Northamptonshire, run by Charge Your Car. Both of its sockets are 22 kW Type 2. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Willow Place Shopping Centre (Be.EV), 2.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Behind and to LHS of the gatehouse. Access to visitors. Please contract gatehouse. Fitted under Midlands PiP,
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Behind and to LHS of the gatehouse (Charge Your Car)?
Up to 22 kW AC via Type 2.
How many charging sockets does Behind and to LHS of the gatehouse (Charge Your Car) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Behind and to LHS of the gatehouse?
Behind and to LHS of the gatehouse is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Behind and to LHS of the gatehouse (Charge Your Car)?
Willow Place Shopping Centre (Be.EV) is 2.1 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Behind and to LHS of the gatehouse (Charge Your Car)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Behind and to LHS of the gatehouse (Charge Your Car)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Behind and to LHS of the gatehouse (Charge Your Car)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Rockingham Motor Speedway
- Rockingham Race Track 4
- Marlec Engineering Corby
- Ashbury Chocolates
- Pod Point Weetabix - Corby
- Telford Lane
- Cheapest nearby
- Pod Point Weetabix - Corby · 20.4p per kWh · 7 kW · 1.1 mi