Charge Your Car · EV charging site
Belmont Park and Ride
Carrville, Durham, DH1 1SR
Belmont Park and Ride is an EV charging site in Durham, County Durham, run by Charge Your Car. Its 2 sockets reach up to 50 kW, with CHAdeMO at the top speed, and the price is listed as £1.00/session. 6 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Durham Park and Ride Belmont (Be.EV), 110 yards away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/session(from Open Charge Map, 8 Aug 2019)
- Notes
- Must be using Park & Ride
- Getting there
- Only available 7am - 7pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Belmont Park and Ride (Charge Your Car)?
The listed price is £1.00/session. Prices can change, so check the price at the charger before you start.
How fast is charging at Belmont Park and Ride (Charge Your Car)?
Up to 50 kW DC via Type 2, CHAdeMO, BS1363 3 Pin 13 Amp.
How many charging sockets does Belmont Park and Ride (Charge Your Car) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Belmont Park and Ride?
Belmont Park and Ride is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Belmont Park and Ride (Charge Your Car)?
Durham Park and Ride Belmont (Be.EV) is 110 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Belmont Park and Ride (Charge Your Car)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Belmont Park and Ride (Charge Your Car)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Belmont Park and Ride (Charge Your Car)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Durham Park and Ride Belmont
- DCC Belmont Park & Ride 2
- Shell Recharge Shell Durham
- Ramside Hall Hotel
- County Durham & Darlington Fire & Rescue
- Bannatyne Durham
- Cheapest nearby
- Durham Park and Ride Belmont · 59p per kWh · 50 kW · 110 yd
- Fastest nearby
- Shell Recharge Shell Durham · 175 kW · 0.2 mi