# Bus Station Car Park, Wooler · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-bus-station-car-park-wooler-uk

Bus Station Car Park, Wooler is an EV charging site in Wooler, Northumberland, run by Charge Your Car. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Market Place, NE71 6LA
- **Area:** Wooler, Northumberland, United Kingdom
- **Coordinates (latitude, longitude):** 55.54618, -2.01436

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required
- **Notes:** No parking fees. Siemens unit (triple-head charger).

## Common questions

### How much does it cost to charge at Bus Station Car Park, Wooler (Charge Your Car)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Bus Station Car Park, Wooler (Charge Your Car)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does Bus Station Car Park, Wooler (Charge Your Car) have?

2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates Bus Station Car Park, Wooler?

Bus Station Car Park, Wooler is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Bus Station Car Park, Wooler (Charge Your Car)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Bus Station Car Park, Wooler (Charge Your Car)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Bus Station Car Park, Wooler (Charge Your Car)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Wooler](https://ampmap.co.uk/chargers/united-kingdom/northumberland/wooler)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Black Bull Hotel · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-black-bull-hotel-uk) - Type 2 · 2 High Street
- [7-9 South Road · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-7-9-south-road-uk) - Type 2 7 kW · 7-9 South Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-bus-station-car-park-wooler-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 19 Jun 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
