Charge Your Car · EV charging site
Car Park
Emersons Green, Mangotsfield, BS16 7FR
Car Park is an EV charging site at Emersons Green in Mangotsfield, South Gloucestershire, run by Charge Your Car. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. Amp Map lists 1 other charge point named Car Park in Mangotsfield. 8 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Bristol and Bath Science Park Hub (GeniePoint), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Located in the main building car park opposite motorbike parking
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Car Park (Charge Your Car)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Car Park (Charge Your Car) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Car Park?
Car Park is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Car Park (Charge Your Car)?
Bristol and Bath Science Park Hub (GeniePoint) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Car Park (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Car Park (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Car Park (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Private business car park
- Bristol and Bath Science Park Hub
- Ald Automotive
- MFG Blackhorse
- Pod Point Travelodge - Bristol
- InstaVolt Costa Coffee
- Cheapest nearby
- Pod Point Travelodge - Bristol · 50.4p per kWh · 7 kW · 0.5 mi
- Fastest nearby
- MFG Blackhorse · 150 kW · 0.3 mi