Charge Your Car · EV charging site
Central Square South
Central Square South, Newcastle upon Tyne, NE1 3XX
Central Square South is an EV charging site in Newcastle upon Tyne (NE1 3XX), run by Charge Your Car. It has a single 7 kW Type 2 socket. Amp Map lists 1 other charge point named Central Square South in Newcastle upon Tyne. 41 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hilton Newcastle Gateshead - Bottle Bank Gateshead (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Central Square South
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Central Square South (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Central Square South (Charge Your Car) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Central Square South?
Central Square South is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Central Square South (Charge Your Car)?
Hilton Newcastle Gateshead - Bottle Bank Gateshead (BP Pulse) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Central Square South (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Central Square South (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Central Square South (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.