# Chapel Street Multistorey Car Park, Derby · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-chapel-street-multistorey-car-park-derby-uk

Chapel Street Multistorey Car Park, Derby is an EV charging site in Derby, run by Charge Your Car. All 3 of its sockets are 7 kW Type 2.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** 13 Chapel Street, DE1 3GU
- **Area:** Derby, United Kingdom
- **Coordinates (latitude, longitude):** 52.92595, -1.48054

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 3 | Not listed |

- **Price:** £0.20/kWh;min £1.00 (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Chapel Street Multistorey Car Park, Derby (Charge Your Car)?

The listed price is £0.20/kWh;min £1.00. Prices can change, so check the price at the charger before you start.

### How fast is charging at Chapel Street Multistorey Car Park, Derby (Charge Your Car)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Chapel Street Multistorey Car Park, Derby (Charge Your Car) have?

3 charging sockets: 3 × 7 kW Type 2.

### Who operates Chapel Street Multistorey Car Park, Derby?

Chapel Street Multistorey Car Park, Derby is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Chapel Street Multistorey Car Park, Derby (Charge Your Car)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Chapel Street Multistorey Car Park, Derby (Charge Your Car)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Chapel Street Multistorey Car Park, Derby (Charge Your Car)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Derby](https://ampmap.co.uk/chargers/united-kingdom/derby/derby)
- [Cheapest charging in Derby](https://ampmap.co.uk/chargers/united-kingdom/derby/derby/cheapest)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Parksafe Multi-storey Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-parksafe-multi-storey-car-park-uk) - Type 2 7 kW · Parksafe Multi-storey Car Park, Bold Lane · From 65p/kWh
- [Parksafe Multistorey Car Park, De1 3NT · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-parksafe-multistorey-car-park-de1-3nt-uk) - Type 2 7 kW · Parksafe Multistorey Car Park, De1 3NT
- [13 Chapel Street Multistory Car-Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-13-chapel-street-multistory-car-park-uk) - Type 2 7 kW · 13 Chapel Street Multistory Car-Park · From 65p/kWh
- [Darwin Place Car Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-darwin-place-car-park-de1-2bh-uk) - Type 2 7 kW · Darwin Place Car Park · From 65p/kWh
- [51 Abbey Street Car Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-abbey-street-car-park-derby-uk) - Type 2 7 kW · 51 Abbey Street Car-Park · From 65p/kWh
- [Kedleston road · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-kedleston-road-uk) - Type 2 7 kW · Kedleston road · From 65p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-chapel-street-multistorey-car-park-derby-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 Oct 2021).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
