Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Cleminson Street Car Park

Cleminson Street, Manchester City Centre, M3 6BW

Cleminson Street Car Park is an EV charging site in Manchester City Centre, Manchester, run by Be.EV and open 24 hours a day. Both of its sockets are 7 kW Type 2, and the published price is £0.59 per kWh. Amp Map measured 0% uptime here over the last 30 days. 24 other charging sites are listed within a mile, and the nearest site with 50 kW or more is A6 Crescent House Lay-by (Be.EV), 0.5 miles away.

Status

Out of service

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW2 connectors · 59p per kWhOut of service
BVFGM0051-A0% reliabilityOut of order
BVFGM0051-B0% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BVFGM0051-A

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Cleminson Street Car Park (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Cleminson Street Car Park (Be.EV)?

Up to 7 kW AC via Type 2.

How many charging sockets does Cleminson Street Car Park (Be.EV) have?

2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.

Is Cleminson Street Car Park (Be.EV) open 24/7?

Yes - Cleminson Street Car Park (Be.EV) is open 24 hours a day, 7 days a week.

How reliable is Cleminson Street Car Park (Be.EV)?

Amp Map measured 0% uptime here from recorded live status over the last 30 days.

Who operates Cleminson Street Car Park?

Cleminson Street Car Park is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Cleminson Street Car Park (Be.EV)?

A6 Crescent House Lay-by (Be.EV) is 0.5 miles away in a straight line, with up to 51 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Cleminson Street Car Park (Be.EV)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Cleminson Street Car Park (Be.EV)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Cleminson Street Car Park (Be.EV)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.