Charge Your Car · EV charging site
Connaught Street
Connaught Street, Bayswater, W2 2AY
Connaught Street is an EV charging site in Bayswater, Greater London, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and the price is listed as £0.09/kWh. 637 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Brook Street, Hyde Park Estate, Westminster (ESB Energy), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.09/kWh(from Open Charge Map, 2 Dec 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Connaught Street (Charge Your Car)?
The listed price is £0.09/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Connaught Street (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Connaught Street (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Connaught Street?
Connaught Street is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Connaught Street (Charge Your Car)?
Brook Street, Hyde Park Estate, Westminster (ESB Energy) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Connaught Street (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Connaught Street (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Connaught Street (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- ubitricity Distributed Energy Systems UK Ltd. 10 Hyde Park Square
- ubitricity Distributed Energy Systems UK Ltd. 12 Hyde Park Square
- ubitricity Distributed Energy Systems UK Ltd. 26 Hyde Park Street
- ubitricity Distributed Energy Systems UK Ltd. 15 Hyde Park Square
- ubitricity Distributed Energy Systems UK Ltd. 2 Hyde Park Crescent, opp.
- ubitricity Distributed Energy Systems UK Ltd. 3 Hyde Park Crescent
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 10 Hyde Park Square · 56p per kWh · 5 kW · 40 yd