Charge Your Car · EV charging site
Corby Enterprise Centre
London Road, Corby, NN17 5EU
Corby Enterprise Centre is an EV charging site in Corby, North Northamptonshire, run by Charge Your Car. Its 8 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Weldon Park (Corby) (evyve), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 2 May 2017)
- Notes
- One Siemens CP500 (22kW) and a Pod Point post.
- Getting there
- Advised available to the public 9am - 5pm, tenants 24/7.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Corby Enterprise Centre (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Corby Enterprise Centre (Charge Your Car)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Corby Enterprise Centre (Charge Your Car) have?
8 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 4 × 7 kW Type 2.
Who operates Corby Enterprise Centre?
Corby Enterprise Centre is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Corby Enterprise Centre (Charge Your Car)?
Weldon Park (Corby) (evyve) is 1.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Corby Enterprise Centre (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Corby Enterprise Centre (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Corby Enterprise Centre (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Snrg
- Access for visitors and staff only
- Corby Skatepark
- Rockingham Motor Speedway
- Rockingham Race Track 4
- Weldon Park (Corby)
- Cheapest nearby
- Weldon Park (Corby) · 85p per kWh · 75 kW · 1.1 mi
- Fastest nearby
- Weldon Park (Corby) · 75 kW · 1.1 mi