Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Charge Your Car · EV charging site

Corby Enterprise Centre

London Road, Corby, NN17 5EU

Corby Enterprise Centre is an EV charging site in Corby, North Northamptonshire, run by Charge Your Car. Its 8 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Weldon Park (Corby) (evyve), 1.1 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 2 May 2017Last verified 2 May 2017

Connectors

Type 2 · 7 kW4 connectors
BS1363 3 Pin 13 Amp · 3 kW1 connector

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Price
Free(from Open Charge Map, 2 May 2017)
Notes
One Siemens CP500 (22kW) and a Pod Point post.
Getting there
Advised available to the public 9am - 5pm, tenants 24/7.

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Corby Enterprise Centre (Charge Your Car)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Corby Enterprise Centre (Charge Your Car)?

Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.

How many charging sockets does Corby Enterprise Centre (Charge Your Car) have?

8 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 4 × 7 kW Type 2.

Who operates Corby Enterprise Centre?

Corby Enterprise Centre is on the Charge Your Car network.

Where is the nearest charger with 50 kW or more to Corby Enterprise Centre (Charge Your Car)?

Weldon Park (Corby) (evyve) is 1.1 miles away in a straight line, with up to 75 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Corby Enterprise Centre (Charge Your Car)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Corby Enterprise Centre (Charge Your Car)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Corby Enterprise Centre (Charge Your Car)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 2 May 2017

Amp Map does not take payment. You pay the operator.