Charge Your Car · EV charging site
Curzon Place, NG3 1DJ
Curzon Place, Nottingham, NG3 1DJ
Curzon Place, NG3 1DJ is an EV charging site in Nottingham, run by Charge Your Car. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 21 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Nottingham, UK (Tesla), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh; min £1.50(from Open Charge Map, 2 Jun 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Curzon Place, NG3 1DJ (Charge Your Car)?
The listed price is £0.20/kWh; min £1.50. Prices can change, so check the price at the charger before you start.
How fast is charging at Curzon Place, NG3 1DJ (Charge Your Car)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Curzon Place, NG3 1DJ (Charge Your Car) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
Who operates Curzon Place, NG3 1DJ?
Curzon Place, NG3 1DJ is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Curzon Place, NG3 1DJ (Charge Your Car)?
Nottingham, UK (Tesla) is 0.1 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Curzon Place, NG3 1DJ (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Curzon Place, NG3 1DJ (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Curzon Place, NG3 1DJ (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- intu Victoria Shopping Centre
- Intu Victoria, North - Nottingham
- Nottingham, UK
- Intu Victoria Centre - South Car Park
- Outside No: 210
- Peel Street
- Cheapest nearby
- Nottingham, UK · 50p per kWh · 250 kW · 0.1 mi
- Fastest nearby
- Nottingham, UK · 250 kW · 0.1 mi