# Durham County Council Offices · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-durham-county-council-offices-uk

Durham County Council Offices is an EV charging site in Spennymoor, County Durham, run by Charge Your Car. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as £1.00/session.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Durham County Council Offices, DL16 6JQ
- **Area:** Spennymoor, County Durham, United Kingdom
- **Coordinates (latitude, longitude):** 54.70183, -1.57929

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** £1.00/session (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Durham County Council Offices (Charge Your Car)?

The listed price is £1.00/session. Prices can change, so check the price at the charger before you start.

### How fast is charging at Durham County Council Offices (Charge Your Car)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Durham County Council Offices (Charge Your Car) have?

2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Durham County Council Offices?

Durham County Council Offices is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Durham County Council Offices (Charge Your Car)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Durham County Council Offices (Charge Your Car)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Durham County Council Offices (Charge Your Car)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Spennymoor](https://ampmap.co.uk/chargers/united-kingdom/county-durham/spennymoor)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Greenlane Council Offices · Be.EV](https://ampmap.co.uk/charger/be-ev-greenlane-council-offices-uk) - Type 2 7 kW · Greenlane Offices · From 59p/kWh
- [DCC Cambridge Street 1 · MER](https://ampmap.co.uk/charger/mer-dcc-cambridge-street-1-uk) - Type 2 22 kW · Cambridge Street
- [Spennymoor Leisure Centre Car Park · Be.EV](https://ampmap.co.uk/charger/be-ev-spennymoor-leisure-centre-car-park-uk) - CCS 60 kW, CHAdeMO 50 kW · Cambridge Street · From 84p/kWh
- [Festival Walk Car Park · Be.EV](https://ampmap.co.uk/charger/mer-dcc-festival-walk-uk) - Type 2 22 kW · Festival Walk Car Park · From 59p/kWh
- [Eamont Road Car Park · Be.EV](https://ampmap.co.uk/charger/mer-dcc-eamont-road-car-park-uk) - Type 2 22 kW · Eamont Road Car Park · From 59p/kWh
- [Durham, UK · Tesla](https://ampmap.co.uk/charger/tesla-durham-uk-uk) - CCS 250 kW · Unit 1, Low Main Court, Integra 61 North · From 29p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-durham-county-council-offices-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 8 Aug 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
