Charge Your Car · EV charging site
Durham County Hall
Framwellgate Peth, Durham, DH1 5UQ
Durham County Hall is an EV charging site in Durham, County Durham, run by Charge Your Car. All 5 of its sockets are 7 kW Type 2. 12 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Dryburn View (InstaVolt Ltd), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/session;£10.00 overstay after 4 hours,£1.00/session(from Open Charge Map, 24 Sept 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Durham County Hall (Charge Your Car)?
The listed price is £1.00/session;£10.00 overstay after 4 hours,£1.00/session. Prices can change, so check the price at the charger before you start.
How fast is charging at Durham County Hall (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Durham County Hall (Charge Your Car) have?
5 charging sockets: 5 × 7 kW Type 2.
Who operates Durham County Hall?
Durham County Hall is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Durham County Hall (Charge Your Car)?
Dryburn View (InstaVolt Ltd) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Durham County Hall (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Durham County Hall (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Durham County Hall (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Wharton Park · 59p per kWh · 22 kW · 0.4 mi
- Fastest nearby
- Dryburn View · 50 kW · 0.5 mi