Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Charge Your Car · EV charging site

Durham University New Engineering Building

Engineer Car Park, Durham, DH1 3LE

Durham University New Engineering Building is an EV charging site in Durham, County Durham, run by Charge Your Car. It has a single 3 kW BS1363 3 Pin 13 Amp socket, and charging is listed as free. 10 other charging sites are listed within a mile, and the nearest site with 50 kW or more is St Giles Filling Station (InstaVolt Ltd), 1 mile away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 5 Nov 2018Last verified 5 Nov 2018

Connectors

BS1363 3 Pin 13 Amp · 3 kW1 connector

Site information

Opening hours
Not published
Access
Public · membership required · access key required
Price
Free(from Open Charge Map, 5 Nov 2018)

Always check directly with the charge point operator for the most up-to-date information.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Durham University New Engineering Building (Charge Your Car)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

How fast is charging at Durham University New Engineering Building (Charge Your Car)?

Up to 3 kW AC via BS1363 3 Pin 13 Amp.

How many charging sockets does Durham University New Engineering Building (Charge Your Car) have?

1 charging socket: 1 × 3 kW BS1363 3 Pin 13 Amp.

Who operates Durham University New Engineering Building?

Durham University New Engineering Building is on the Charge Your Car network.

Where is the nearest charger with 50 kW or more to Durham University New Engineering Building (Charge Your Car)?

St Giles Filling Station (InstaVolt Ltd) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.

Data: Open Charge Map · verified 5 Nov 2018

Amp Map does not take payment. You pay the operator.