Charge Your Car · EV charging site
Hareshaw Linn Car Park
Hareshaw Linn Car Park, Bellingham, NE48 2BZ
Hareshaw Linn Car Park is an EV charging site in Bellingham, Northumberland, run by Charge Your Car. It has a single 7 kW Type 2 socket, and the price is listed as £1.00/charge admin fee. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Henshaw Garage (BP Pulse), 12.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/charge admin fee(from Open Charge Map, 4 Sept 2017)
- Getting there
- Station Road
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hareshaw Linn Car Park (Charge Your Car)?
The listed price is £1.00/charge admin fee. Prices can change, so check the price at the charger before you start.
How fast is charging at Hareshaw Linn Car Park (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Hareshaw Linn Car Park (Charge Your Car) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Hareshaw Linn Car Park?
Hareshaw Linn Car Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Hareshaw Linn Car Park (Charge Your Car)?
Henshaw Garage (BP Pulse) is 12.6 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hareshaw Linn Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hareshaw Linn Car Park (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hareshaw Linn Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Cheapest nearby
- Pod Point Bellingham Town Hall · 45.6p per kWh · 7 kW · 0.2 mi