Charge Your Car · EV charging site
Hewlett Packard Bristol Office 2
Long Down Avenue, Mangotsfield, BS34 8QZ
Hewlett Packard Bristol Office 2 is an EV charging site in Mangotsfield, South Gloucestershire, run by Charge Your Car. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Revive_SGC (GeniePoint), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Hewlett Packard Bristol Office 2 (Charge Your Car)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Hewlett Packard Bristol Office 2 (Charge Your Car) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates Hewlett Packard Bristol Office 2?
Hewlett Packard Bristol Office 2 is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Hewlett Packard Bristol Office 2 (Charge Your Car)?
Revive_SGC (GeniePoint) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hewlett Packard Bristol Office 2 (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hewlett Packard Bristol Office 2 (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hewlett Packard Bristol Office 2 (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hewlett Packard Bristol Office 3
- Business Car Park
- Revive_SGC
- Bristol Parkway Railway Station
- Bristol Golf Centre
- MFG Texaco Stapleton
- Fastest nearby
- Bristol Golf Centre · 120 kW · 1.1 mi