Charge Your Car · EV charging site
Highstreet Car Park, Arnold
Highstreet Car Park, Arnold, NG5 7BQ
Highstreet Car Park, Arnold is an EV charging site in Arnold, Nottinghamshire, run by Charge Your Car. It has a single socket, with CCS and CHAdeMO at up to 50 kW. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is High Street Car Park (BP Pulse), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh; min £1.50(from Open Charge Map, 2 Jun 2020)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Highstreet Car Park, Arnold (Charge Your Car)?
The listed price is £0.20/kWh; min £1.50. Prices can change, so check the price at the charger before you start.
How fast is charging at Highstreet Car Park, Arnold (Charge Your Car)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Highstreet Car Park, Arnold (Charge Your Car) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2.
Who operates Highstreet Car Park, Arnold?
Highstreet Car Park, Arnold is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Highstreet Car Park, Arnold (Charge Your Car)?
High Street Car Park (BP Pulse) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Highstreet Car Park, Arnold (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Highstreet Car Park, Arnold (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Highstreet Car Park, Arnold (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- High Street Car Park
- St Albans Road Car Park Nottingham
- RAW Greene King Coopers Brook 3
- Civic Centre Arnot Hill Park Nottingham
- Nottingham City Council D2N2
- Travellers Rest (Mapperley)
- Cheapest nearby
- St Albans Road Car Park Nottingham · 65p per kWh · 7 kW · 0.3 mi
- Fastest nearby
- Travellers Rest (Mapperley) · 75 kW · 1.2 mi