Charge Your Car · EV charging site
Houghton Le Spring
Station Road Car Park, Houghton-Le-Spring, DH4 5AH
Houghton Le Spring is an EV charging site in Houghton-Le-Spring, Sunderland, run by Charge Your Car. Its 2 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £0.65/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Houghton-le-Spring (Fastned), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.65/kWh(from Open Charge Map, 25 Nov 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Houghton Le Spring (Charge Your Car)?
The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Houghton Le Spring (Charge Your Car)?
Up to 50 kW DC via CHAdeMO, Type 2, CCS.
How many charging sockets does Houghton Le Spring (Charge Your Car) have?
2 charging sockets: 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2, 1 × 50 kW CCS.
Who operates Houghton Le Spring?
Houghton Le Spring is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Houghton Le Spring (Charge Your Car)?
Houghton-le-Spring (Fastned) is 0.2 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Houghton Le Spring (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Houghton Le Spring (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Houghton Le Spring (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Houghton-le-Spring
- Cygnet Way
- Evolve Business Centre, Cygnet Way
- Cygnet Way
- Houghton and Hetton Depot
- Market Street 1
- Cheapest nearby
- Houghton-le-Spring · 79p per kWh · 300 kW · 0.2 mi
- Fastest nearby
- Houghton-le-Spring · 300 kW · 0.2 mi