Charge Your Car · EV charging site
Islingword Road, Brighton
Islingword Road, Brighton, BN2 3DD
Islingword Road, Brighton is an EV charging site in Brighton, Brighton and Hove, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and the price is listed as £1.00/charge admin fee. 117 other charging sites are listed within a mile, and the nearest site with 50 kW or more is University Way SF Connect (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/charge admin fee(from Open Charge Map, 12 Jun 2019)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Islingword Road, Brighton (Charge Your Car)?
The listed price is £1.00/charge admin fee. Prices can change, so check the price at the charger before you start.
How fast is charging at Islingword Road, Brighton (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Islingword Road, Brighton (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Islingword Road, Brighton?
Islingword Road, Brighton is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Islingword Road, Brighton (Charge Your Car)?
University Way SF Connect (BP Pulse) is 0.4 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Islingword Road, Brighton (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Islingword Road, Brighton (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Islingword Road, Brighton (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.