Charge Your Car · EV charging site
Kellogg Tower, London
Gainsborogh Gardens, Northolt, UB6 0JA
Kellogg Tower, London is an EV charging site in Northolt, Greater London, run by Charge Your Car. It has a single socket, with Type 2 at up to 7 kW, and charging is listed as free. 17 other charging sites are listed within a mile, and the nearest site with 50 kW or more is South Harrow LU Station Car Park (ESB Energy), 0.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 9 Sept 2022)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Kellogg Tower, London (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Kellogg Tower, London (Charge Your Car)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Kellogg Tower, London (Charge Your Car) have?
1 charging socket: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates Kellogg Tower, London?
Kellogg Tower, London is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Kellogg Tower, London (Charge Your Car)?
South Harrow LU Station Car Park (ESB Energy) is 0.8 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Kellogg Tower, London (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Kellogg Tower, London (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Kellogg Tower, London (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Whitton Avenue West
- ubitricity Distributed Energy Systems UK Ltd. 17 Rosebank Avenue
- Greenford Road
- ubitricity Distributed Energy Systems UK Ltd. 72 Fernbank Avenue
- ubitricity Distributed Energy Systems UK Ltd. 83 Rosebank Avenue
- ubitricity Distributed Energy Systems UK Ltd. 96 Fernbank Avenue
- Cheapest nearby
- ubitricity Distributed Energy Systems UK Ltd. 17 Rosebank Avenue · 45p per kWh · 5 kW · 0.2 mi