Charge Your Car · EV charging site
Livingstone Road Car Park
Livingstone Road, Sunderland, SR1 3AW
Livingstone Road Car Park is an EV charging site in Sunderland, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and charging is listed as free. 25 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Charles Street, Sunderland (Blink Charging), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 21 Oct 2018)
- Notes
- Powershare could result in a limited 16A charge
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Livingstone Road Car Park (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Livingstone Road Car Park (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Livingstone Road Car Park (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Livingstone Road Car Park?
Livingstone Road Car Park is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Livingstone Road Car Park (Charge Your Car)?
Charles Street, Sunderland (Blink Charging) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Livingstone Road Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Livingstone Road Car Park (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Livingstone Road Car Park (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.