Charge Your Car · EV charging site
Madeira Drive, Brighton
Madeira Drive, Brighton, BN2 1AY
Madeira Drive, Brighton is an EV charging site in Brighton, Brighton and Hove, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and the price is listed as £1.00/charge admin fee. 74 other charging sites are listed within a mile, and the nearest site with 50 kW or more is University Way SF Connect (BP Pulse), 1.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £1.00/charge admin fee(from Open Charge Map, 2 Jan 2020)
- Getting there
- Just by the Brighton Big Wheel two marked EV Spaces
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Madeira Drive, Brighton (Charge Your Car)?
The listed price is £1.00/charge admin fee. Prices can change, so check the price at the charger before you start.
How fast is charging at Madeira Drive, Brighton (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Madeira Drive, Brighton (Charge Your Car) have?
2 charging sockets: 1 × 7 kW Type 2.
Who operates Madeira Drive, Brighton?
Madeira Drive, Brighton is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Madeira Drive, Brighton (Charge Your Car)?
University Way SF Connect (BP Pulse) is 1.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Madeira Drive, Brighton (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Madeira Drive, Brighton (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Madeira Drive, Brighton (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.