Charge Your Car · EV charging site
Maidenstone Hill
Maidenstone Hill, Greenwich, SE10 8SX
Maidenstone Hill is an EV charging site in Greenwich, Greater London, run by Charge Your Car. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 65 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Maidenstone Hill / Blackheath Hill (A2) (Charge Your Car), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Maidenstone Hill (Charge Your Car)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does Maidenstone Hill (Charge Your Car) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates Maidenstone Hill?
Maidenstone Hill is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Maidenstone Hill (Charge Your Car)?
Maidenstone Hill / Blackheath Hill (A2) (Charge Your Car) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Maidenstone Hill (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Maidenstone Hill (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Maidenstone Hill (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Blissett Street
- Blisset Street
- Maidenstone Hill / Blackheath Hill (A2)
- ubitricity Distributed Energy Systems UK Ltd. 26 Dartmouth Row
- Pod Point Costa Blackheath Retail Park
- ubitricity Distributed Energy Systems UK Ltd. Lewisham Hill opp. Open Area Footpath, opp. O
- Cheapest nearby
- Pod Point Costa Blackheath Retail Park · 58.8p per kWh · 7 kW · 0.3 mi