Charge Your Car · EV charging site
Net Tram Park & Ride, Nottingham
Nottingham Road, Long Eaton, NG11 8BS
Net Tram Park & Ride, Nottingham is an EV charging site in Long Eaton, Derbyshire, run by Charge Your Car. Its 10 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Clifton South Park & Ride, Rushcliffe (BP Pulse), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh;min £1.00,£0.20/kWh; min £1.50(from Open Charge Map, 2 Jun 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Net Tram Park & Ride, Nottingham (Charge Your Car)?
The listed price is £0.20/kWh;min £1.00,£0.20/kWh; min £1.50. Prices can change, so check the price at the charger before you start.
How fast is charging at Net Tram Park & Ride, Nottingham (Charge Your Car)?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Net Tram Park & Ride, Nottingham (Charge Your Car) have?
10 charging sockets: 10 × 7 kW Type 2, 1 × 50 kW CCS, 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO.
Who operates Net Tram Park & Ride, Nottingham?
Net Tram Park & Ride, Nottingham is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Net Tram Park & Ride, Nottingham (Charge Your Car)?
Clifton South Park & Ride, Rushcliffe (BP Pulse) is 10 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Net Tram Park & Ride, Nottingham (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Net Tram Park & Ride, Nottingham (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Net Tram Park & Ride, Nottingham (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Clifton South Park & Ride, Rushcliffe
- Nottingham County Council
- Clifton Leisure Centre
- Clifton Leisure Centre
- Nottingham Trent University Clifton Campus
- The Cottage Hotel
- Cheapest nearby
- Clifton South Park & Ride, Rushcliffe · 65p per kWh · 50 kW · 10 yd