Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

New Street Car Park

New Street Car Park, New Street, Sutton in Ashfield, NG17 1BW

New Street Car Park is an EV charging site in Sutton in Ashfield, Nottinghamshire, run by BP Pulse. All 8 of its sockets are 7 kW Type 2, and the published price is £0.65 per kWh. Recorded live status shows it is usually busiest around 9 pm, and Amp Map measured 56% uptime and recorded 64 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Kingsmill reservoir (BP Pulse), 0.6 miles away.

Status

2 of 8 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 7 kW8 connectors · 65p per kWh2 free1 in use5 out of service
1220144% reliabilityOut of order
1220144% reliabilityOut of order
1220233% reliabilityOut of order
1220233% reliabilityAvailable
12203100% reliabilityAvailable
12203100% reliabilityCharging
122040% reliabilityOut of order
122040% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
12201

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 27 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 7 kW Type 2~7h 54m · ≈ 55 kWh · ~£36
Tesla Model 3 Rear-Wheel Drive 10–80% · 7 kW Type 2~5h 42m · ≈ 40 kWh · ~£26
Audi Q4 e-tron 50 10–80% · 7 kW Type 2~7h 18m · ≈ 51 kWh · ~£33
Hyundai IONIQ 5 10–80% · 7 kW Type 2~7h 16m · ≈ 51 kWh · ~£33
MG Motor MG4 Trophy 10–80% · 7 kW Type 2~6h 6m · ≈ 43 kWh · ~£28
Hyundai Kona Electric Long Range 10–80% · 7 kW Type 2~5h 48m · ≈ 41 kWh · ~£26
Nissan LEAF 10–80% · 7 kW Type 2~4h 15m · ≈ 28 kWh · ~£18

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at New Street Car Park (BP Pulse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at New Street Car Park (BP Pulse)?

Up to 7 kW AC via Type 2.

How many charging sockets does New Street Car Park (BP Pulse) have?

8 charging sockets: 8 × 7 kW Type 2. Live per-socket availability is shown on this page.

When is New Street Car Park (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is New Street Car Park (BP Pulse)?

Amp Map measured 56% uptime here from recorded live status over the last 30 days, across 64 observed charging sessions.

Who operates New Street Car Park?

New Street Car Park is on the BP Pulse network.

Where is the nearest charger with 50 kW or more to New Street Car Park (BP Pulse)?

Kingsmill reservoir (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at New Street Car Park (BP Pulse)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New Street Car Park (BP Pulse)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£26 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at New Street Car Park (BP Pulse)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.