# Newhaven Town Centre Car Park · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-newhaven-town-centre-car-park-uk

Newhaven Town Centre Car Park is an EV charging site in Peacehaven, East Sussex, run by Charge Your Car. Its 3 sockets reach up to 50 kW, with CHAdeMO and CCS at the top speed, and the price is listed as £2.50 + £0.20/kWh.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Town Centre Car Park, BN9 9BH
- **Area:** Peacehaven, East Sussex, United Kingdom
- **Coordinates (latitude, longitude):** 50.79477, 0.04752

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** £2.50 + £0.20/kWh (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Newhaven Town Centre Car Park (Charge Your Car)?

The listed price is £2.50 + £0.20/kWh. Prices can change, so check the price at the charger before you start.

### How fast is charging at Newhaven Town Centre Car Park (Charge Your Car)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

### How many charging sockets does Newhaven Town Centre Car Park (Charge Your Car) have?

3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 43 kW Type 2.

### Who operates Newhaven Town Centre Car Park?

Newhaven Town Centre Car Park is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Newhaven Town Centre Car Park (Charge Your Car)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Newhaven Town Centre Car Park (Charge Your Car)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Newhaven Town Centre Car Park (Charge Your Car)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Peacehaven](https://ampmap.co.uk/chargers/united-kingdom/east-sussex/peacehaven)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Pod Point Safford Park](https://ampmap.co.uk/charger/pod-point-safford-park-2-uk) - Type 2 7 kW · Valentine House, 1 Parker Drive Newhaven · From 27.6p/kWh
- [BP Peacehaven · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-bp-peacehaven-uk) - CHAdeMO 50 kW, Type 2 50 kW · 180 South Coast Road
- [Morrisons Seaford · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-seaford-uk) - CCS 50 kW, CHAdeMO 50 kW · Dane Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-newhaven-town-centre-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 29 Aug 2022).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
