Charge Your Car · EV charging site
Next New Malden
88 Bushey Road, New Malden, SW20 0JH
Next New Malden is an EV charging site in New Malden, Greater London, run by Charge Your Car. All 18 of its sockets are 7 kW Type 2. 161 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Pod Point Tesco Extra - New Malden, 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh;min £1.00(from Open Charge Map, 10 Sept 2019)
- Notes
- Accepts CYC cards Costa coffee concession in Next store.
- Getting there
- Max stay 3 hours (CCTV enforcement)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Next New Malden (Charge Your Car)?
The listed price is £0.20/kWh;min £1.00. Prices can change, so check the price at the charger before you start.
How fast is charging at Next New Malden (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Next New Malden (Charge Your Car) have?
18 charging sockets: 18 × 7 kW Type 2.
Who operates Next New Malden?
Next New Malden is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Next New Malden (Charge Your Car)?
Pod Point Tesco Extra - New Malden is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Next New Malden (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Next New Malden (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Next New Malden (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - New Malden
- Linkway
- Outside 67 Aboyne Drive
- Emerald House, Claremont Avenue
- 7 Cavendish Avenue
- 2 Belmont Avenue
- Cheapest nearby
- Pod Point Tesco Extra - New Malden · 44.4p per kWh · 50 kW · 0.2 mi
- Fastest nearby
- Pod Point Tesco Extra - New Malden · 50 kW · 0.2 mi