Charge Your Car · EV charging site
Northern Design Centre
Abbotts Hill, Gateshead, NE8 3DF
Northern Design Centre is an EV charging site in Gateshead, run by Charge Your Car. All 6 of its sockets are 7 kW Type 2, and charging is listed as free. 28 other charging sites are listed within a mile, and the nearest site with 50 kW or more is E.ON Drive, 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 23 Aug 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Northern Design Centre (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Northern Design Centre (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Northern Design Centre (Charge Your Car) have?
6 charging sockets: 6 × 7 kW Type 2.
Who operates Northern Design Centre?
Northern Design Centre is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Northern Design Centre (Charge Your Car)?
E.ON Drive is 0.3 miles away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Northern Design Centre (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Northern Design Centre (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Northern Design Centre (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Sage Gateshead
- E.ON Drive
- Swinburne Street Car Park
- Pod Point Tesco Extra - Gateshead Trinity Square
- McDonalds Park Road
- Hilton Newcastle Gateshead - Bottle Bank Gateshead
- Cheapest nearby
- Pod Point Tesco Extra - Gateshead Trinity Square · 44.4p per kWh · 50 kW · 0.4 mi
- Fastest nearby
- E.ON Drive · 300 kW · 0.3 mi