Charge Your Car · EV charging site
Otterburn Castle Hotel
Otterburn Castle Hotel, NE19 1NS
Otterburn Castle Hotel is an EV charging site in Otterburn, Northumberland, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and no site with 50 kW or more is listed within 15 miles.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 2 May 2018)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Otterburn Castle Hotel (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Otterburn Castle Hotel (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Otterburn Castle Hotel (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Otterburn Castle Hotel?
Otterburn Castle Hotel is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Otterburn Castle Hotel (Charge Your Car)?
Amp Map lists no other site with 50 kW or more within 15 miles in a straight line.
How long does a Tesla Model Y Long Range take to charge at Otterburn Castle Hotel (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Otterburn Castle Hotel (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Otterburn Castle Hotel (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.