Charge Your Car · EV charging site
Quayside Multi-Storey Car Park 11
City Road, Newcastle upon Tyne, NE1 3RF
Quayside Multi-Storey Car Park 11 is an EV charging site in Newcastle upon Tyne, run by Charge Your Car. It has a single 7 kW Type 2 socket. 41 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Hilton Newcastle Gateshead - Bottle Bank Gateshead (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Getting there
- Quayside Multi Storey
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Quayside Multi-Storey Car Park 11 (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Quayside Multi-Storey Car Park 11 (Charge Your Car) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates Quayside Multi-Storey Car Park 11?
Quayside Multi-Storey Car Park 11 is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Quayside Multi-Storey Car Park 11 (Charge Your Car)?
Hilton Newcastle Gateshead - Bottle Bank Gateshead (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Quayside Multi-Storey Car Park 11 (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Quayside Multi-Storey Car Park 11 (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Quayside Multi-Storey Car Park 11 (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.