# Quayside Multi-Storey Car Park · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-quayside-multi-storey-car-park-uk

Quayside Multi-Storey Car Park is an EV charging site in Newcastle upon Tyne, run by Charge Your Car. Its 12 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** City Road, NE1 2AQ
- **Area:** Newcastle upon Tyne, United Kingdom
- **Coordinates (latitude, longitude):** 54.97143, -1.60542
- **Getting there:** Seventh Floor

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 11 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 1 | Not listed |

- **Price:** Free. Parking fees apply. (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Quayside Multi-Storey Car Park (Charge Your Car)?

The listed price is Free. Parking fees apply.. Prices can change, so check the price at the charger before you start.

### How fast is charging at Quayside Multi-Storey Car Park (Charge Your Car)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Quayside Multi-Storey Car Park (Charge Your Car) have?

12 charging sockets: 11 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Quayside Multi-Storey Car Park?

Quayside Multi-Storey Car Park is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Quayside Multi-Storey Car Park (Charge Your Car)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Quayside Multi-Storey Car Park (Charge Your Car)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Quayside Multi-Storey Car Park (Charge Your Car)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Newcastle upon Tyne](https://ampmap.co.uk/chargers/united-kingdom/newcastle-upon-tyne/newcastle-upon-tyne)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Quayside Multi-Storey Car Park 11 · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-quayside-multi-storey-car-park-11-uk) - Type 2 7 kW · City Road
- [City Road · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-city-road-uk) - Type 2 7 kW, BS1363 3 Pin 13 Amp 3 kW · City Road
- [Akenside Hill junction with Queen Street · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-akenside-hill-junction-with-queen-street-uk) - Type 2 7 kW · Akenside Hill junction with Queen Street
- [Civic Centre Underground Barras Bridge · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-civic-centre-underground-barras-bridge-uk) - Type 2 7 kW · Barras Bridge
- [Argyle Street Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-argyle-street-car-park-uk) - Type 2 7 kW · Argyle Street
- [Dean Street, Newcastle · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-dean-street-newcastle-uk) - Type 2 7 kW · Dean Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-quayside-multi-storey-car-park-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 14 Jan 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
