Charge Your Car · EV charging site
Queens Drive Park & Ride, Nottingham
Queens Drive Compound, West Bridgford, NG2 1AP
Queens Drive Park & Ride, Nottingham is an EV charging site in West Bridgford, Nottinghamshire, run by Charge Your Car. Its 22 sockets reach up to 7 kW, with Type 2 at the top speed. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Sandcliffe Nissan Nottingham (Nissan UK Dealer Network), 0.3 miles away.
Status
Out of service
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh;min £1.00,£0.20/kWh; min £1.50(from Open Charge Map, 19 Feb 2020)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Queens Drive Park & Ride, Nottingham (Charge Your Car)?
The listed price is £0.20/kWh;min £1.00,£0.20/kWh; min £1.50. Prices can change, so check the price at the charger before you start.
How fast is charging at Queens Drive Park & Ride, Nottingham (Charge Your Car)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Queens Drive Park & Ride, Nottingham (Charge Your Car) have?
22 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 4 × 7 kW Type 2.
Who operates Queens Drive Park & Ride, Nottingham?
Queens Drive Park & Ride, Nottingham is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Queens Drive Park & Ride, Nottingham (Charge Your Car)?
Sandcliffe Nissan Nottingham (Nissan UK Dealer Network) is 0.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Queens Drive Park & Ride, Nottingham (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Queens Drive Park & Ride, Nottingham (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Queens Drive Park & Ride, Nottingham (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Sandcliffe Nissan Nottingham
- Bus rapid charger
- Wilford Lane Retail Park
- Riverside Farm (Nottingham)
- Gresham Pavillion
- Boots Visitor Car Park
- Cheapest nearby
- Riverside Farm (Nottingham) · 85p per kWh · 75 kW · 0.5 mi
- Fastest nearby
- Wilford Lane Retail Park · 300 kW · 0.4 mi