# Redcar Community Heart · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-redcar-community-heart-uk

Redcar Community Heart is an EV charging site in Redcar, Redcar and Cleveland, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Redcar Community Heart, TS10 1TD
- **Area:** Redcar, Redcar and Cleveland, United Kingdom
- **Coordinates (latitude, longitude):** 54.61695, -1.07100
- **Getting there:** Car park opening hours: Monday to Friday: 07:00-21:00 Saturday: 07:30-16:00 Sunday: 08:00-16:00 Closed Christmas Day, Boxing Day, & New Year's Day

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Redcar Community Heart (Charge Your Car)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Redcar Community Heart (Charge Your Car)?

Up to 7 kW AC via Type 2.

### How many charging sockets does Redcar Community Heart (Charge Your Car) have?

2 charging sockets: 1 × 7 kW Type 2.

### Who operates Redcar Community Heart?

Redcar Community Heart is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Redcar Community Heart (Charge Your Car)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Redcar Community Heart (Charge Your Car)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Redcar Community Heart (Charge Your Car)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Redcar](https://ampmap.co.uk/chargers/united-kingdom/redcar-and-cleveland/redcar)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Coatham Surgery](https://ampmap.co.uk/charger/coatham-surgery-uk) - Coatham Health Village
- [Seafield House Social Services · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-seafield-house-social-services-uk) - Type 2 22 kW · Seafield House Social Services
- [Redcar Central Rail Station Car Park 2 · Blink Charging](https://ampmap.co.uk/charger/blink-charging-redcar-central-rail-station-car-park-2-uk) - Type 2 22 kW · West Dyke Road
- [Morrisons Redcar · GeniePoint](https://ampmap.co.uk/charger/the-geniepoint-network-morrisons-redcar-uk) - CCS 50 kW, CHAdeMO 50 kW · Lord Street
- [McDonald's Redcar Retail Park · InstaVolt Ltd](https://ampmap.co.uk/charger/instavolt-ltd-mcdonald-s-redcar-retail-park-uk) - CCS 120 kW, CHAdeMO 100 kW · Redcar Retail Park
- [Education Training Collective](https://ampmap.co.uk/charger/education-training-collective-uk) - Type 2 7 kW · Redcar College Sandringham Rd

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-redcar-community-heart-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 7 Oct 2020).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
