Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Regent Road Car Park

Regent Road Car Park, 17 Regent Road, Altrincham, WA14 1RY

Regent Road Car Park is an EV charging site in Altrincham, Trafford, run by Be.EV and open 24 hours a day. All 9 of its sockets are 22 kW Type 2, and the published price is £0.59 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 250 charging sessions here over the last 30 days. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Altrincham Leisure Centre (Be.EV), 0.3 miles away.

Status

9 of 9 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW9 connectors · 59p per kWh9 free
BEEVF0018-A100% reliabilityAvailable
BEEVF0018-B100% reliabilityAvailable
BEEVF0019-B99% reliabilityAvailable
BEEVF0020-A100% reliabilityAvailable
BEEVF0020-B100% reliabilityAvailable
BEEVF0021-A100% reliabilityAvailable
BEEVF0021-B100% reliabilityAvailable
BEEVF0022-A100% reliabilityAvailable
BEEVF0022-B100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV appRFID card
Charger ID
BEEVF0018-A
Bays
Must stay plugged in while parked

Facilities

Car park

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m · ≈ 55 kWh · ~£33
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m · ≈ 40 kWh · ~£24
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m · ≈ 51 kWh · ~£30
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m · ≈ 51 kWh · ~£30
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m · ≈ 43 kWh · ~£25
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m · ≈ 41 kWh · ~£24
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Regent Road Car Park (Be.EV)?

The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Regent Road Car Park (Be.EV)?

Up to 22 kW AC via Type 2.

How many charging sockets does Regent Road Car Park (Be.EV) have?

9 charging sockets: 9 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Regent Road Car Park (Be.EV) open 24/7?

Yes - Regent Road Car Park (Be.EV) is open 24 hours a day, 7 days a week.

When is Regent Road Car Park (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 7 am. The live status on this page shows what is free before you set off.

How reliable is Regent Road Car Park (Be.EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 250 observed charging sessions.

Who operates Regent Road Car Park?

Regent Road Car Park is on the Be.EV network.

Where is the nearest charger with 50 kW or more to Regent Road Car Park (Be.EV)?

Altrincham Leisure Centre (Be.EV) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Regent Road Car Park (Be.EV)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh (~£33 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Regent Road Car Park (Be.EV)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh (~£24 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Regent Road Car Park (Be.EV)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.