Charge Your Car · EV charging site
Sneinton Market Car Park, Nottingham
Gedling Street, Nottingham, NG1 1DS
Sneinton Market Car Park, Nottingham is an EV charging site in Nottingham, run by Charge Your Car. Its 8 sockets reach up to 7 kW, with Type 2 at the top speed. 23 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Greens Mill & Old School House Car Park (BP Pulse), 0.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.20/kWh;min £1.00(from Open Charge Map, 24 Oct 2018)
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?
The listed price is £0.20/kWh;min £1.00. Prices can change, so check the price at the charger before you start.
How fast is charging at Sneinton Market Car Park, Nottingham (Charge Your Car)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Sneinton Market Car Park, Nottingham (Charge Your Car) have?
8 charging sockets: 8 × 7 kW Type 2, 2 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Sneinton Market Car Park, Nottingham?
Sneinton Market Car Park, Nottingham is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Sneinton Market Car Park, Nottingham (Charge Your Car)?
Greens Mill & Old School House Car Park (BP Pulse) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Manvers Street Car Park
- Aberdeen Street Car Park
- Lace Market Car Park
- Intu Victoria Centre - South Car Park
- Greens Mill & Old School House Car Park
- Nottingham City Council D2N2
- Cheapest nearby
- Manvers Street Car Park · 65p per kWh · 22 kW · 0.1 mi
- Fastest nearby
- Greens Mill & Old School House Car Park · 50 kW · 0.4 mi