# Sneinton Market Car Park, Nottingham · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-sneinton-market-car-park-nottingham-uk

Sneinton Market Car Park, Nottingham is an EV charging site in Nottingham, run by Charge Your Car. Its 8 sockets reach up to 7 kW, with Type 2 at the top speed.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Gedling Street, NG1 1DS
- **Area:** Nottingham, United Kingdom
- **Coordinates (latitude, longitude):** 52.95403, -1.13886

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 7 kW | 8 | Not listed |
| BS1363 3 Pin 13 Amp | 3 kW | 2 | Not listed |

- **Price:** £0.20/kWh;min £1.00 (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?

The listed price is £0.20/kWh;min £1.00. Prices can change, so check the price at the charger before you start.

### How fast is charging at Sneinton Market Car Park, Nottingham (Charge Your Car)?

Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.

### How many charging sockets does Sneinton Market Car Park, Nottingham (Charge Your Car) have?

8 charging sockets: 8 × 7 kW Type 2, 2 × 3 kW BS1363 3 Pin 13 Amp.

### Who operates Sneinton Market Car Park, Nottingham?

Sneinton Market Car Park, Nottingham is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?

A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?

A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Sneinton Market Car Park, Nottingham (Charge Your Car)?

A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Nottingham](https://ampmap.co.uk/chargers/united-kingdom/nottingham/nottingham)
- [Cheapest charging in Nottingham](https://ampmap.co.uk/chargers/united-kingdom/nottingham/nottingham/cheapest)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Manvers Street Car Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-manvers-street-car-park-uk) - Type 2 22 kW · Manvers Street Car Park · From 65p/kWh
- [Aberdeen Street Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-80278-uk) - Type 2 7 kW · Aberdeen Street Car Park, Longden Street · From 65p/kWh
- [Lace Market Car Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-lace-market-car-park-nottingham-uk) - Type 2 7 kW · Lace Market Car Park, Pilcher Gate · From 65p/kWh
- [Intu Victoria Centre - South Car Park · BP Pulse](https://ampmap.co.uk/charger/charge-your-car-intu-victoria-south-nottingham-uk) - Type 2 7 kW · 201 Victoria Centre, Nottingham · From 65p/kWh
- [Greens Mill & Old School House Car Park · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-greens-mill-and-old-school-house-car-park-uk) - CCS 50 kW, Type 2 7 kW · Greens Mill & Old School House Car Park · From 65p/kWh
- [Nottingham City Council D2N2 · BP Pulse](https://ampmap.co.uk/charger/bp-pulse-nottingham-city-council-d2n2-2-uk) - CCS / CHAdeMO / Type 2 50 kW · Canal Street · From 89p/kWh

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-sneinton-market-car-park-nottingham-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 24 Oct 2018).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
