Charge Your Car · EV charging site
Spondon Street Car Park, Nottingham
Spondon Street Car Park, Arnold, NG5 4AB
Spondon Street Car Park, Nottingham is an EV charging site in Arnold, Nottinghamshire, run by Charge Your Car. Its 6 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge EV Aldi Basford, 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.20/kWh;min £1.00,£0.20/kWh; min £1.50. Contactless Payment Available(from Open Charge Map, 3 Jun 2020)
- Notes
- Contactless Payment Available on rapid charger. Chargemaster Ultracharger
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Spondon Street Car Park, Nottingham (Charge Your Car)?
The listed price is £0.20/kWh;min £1.00,£0.20/kWh; min £1.50. Contactless Payment Available. Prices can change, so check the price at the charger before you start.
How fast is charging at Spondon Street Car Park, Nottingham (Charge Your Car)?
Up to 50 kW DC via Type 2, CCS, CHAdeMO.
How many charging sockets does Spondon Street Car Park, Nottingham (Charge Your Car) have?
6 charging sockets: 6 × 7 kW Type 2, 1 × 43 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO.
Who operates Spondon Street Car Park, Nottingham?
Spondon Street Car Park, Nottingham is on the Charge Your Car network.
Where is the nearest other charger with 50 kW or more to Spondon Street Car Park, Nottingham (Charge Your Car)?
Shell Recharge EV Aldi Basford is 1 mile away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Spondon Street Car Park, Nottingham (Charge Your Car)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Spondon Street Car Park, Nottingham (Charge Your Car)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Spondon Street Car Park, Nottingham (Charge Your Car)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Car Park
- Winchester Street Car Park, Nottingham
- Winwood Heights
- Nottingham City Homes, Winwood Car-Park
- Restricted access to Peugeot customers
- Pod Point The Wells Academy
- Cheapest nearby
- Pod Point The Wells Academy · 45.6p per kWh · 7 kW · 0.7 mi