Charge Your Car · EV charging site
Sunderland Children's Centre
Sunderland Children's Centre, SR4 7TP
Sunderland Children's Centre is an EV charging site in Sunderland, run by Charge Your Car. Both of its sockets are 7 kW Type 2. 12 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lidl-Sunderland, 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public
- Price
- £1.00/charge admin fee. Parking fees apply(from Open Charge Map, 4 Sept 2017)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Sunderland Children's Centre (Charge Your Car)?
The listed price is £1.00/charge admin fee. Parking fees apply. Prices can change, so check the price at the charger before you start.
How fast is charging at Sunderland Children's Centre (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does Sunderland Children's Centre (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Sunderland Children's Centre?
Sunderland Children's Centre is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to Sunderland Children's Centre (Charge Your Car)?
Lidl-Sunderland is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Sunderland Children's Centre (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Sunderland Children's Centre (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Sunderland Children's Centre (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Lidl-Sunderland
- Sunderland Royal Hospital Education Centre Car Park
- Silksworth Community Centre
- Sunderland Royal Hospital
- Sunderland Royal Hospital Chester Lodge
- RAW Greene King The Rosedene 1
- Fastest nearby
- Lidl-Sunderland · 50 kW · 0.5 mi