# Tedco Business Centre, Ne32 3DT · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-tedco-business-centre-ne32-3dt-uk

Tedco Business Centre, Ne32 3DT is an EV charging site in Jarrow, South Tyneside, run by Charge Your Car. Both of its sockets are 22 kW Type 2, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Tedco Business Centre, Ne32 3DT, NE32 3DT
- **Area:** Jarrow, South Tyneside, United Kingdom
- **Coordinates (latitude, longitude):** 54.98485, -1.50197

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| Type 2 | 22 kW | 2 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at Tedco Business Centre, Ne32 3DT (Charge Your Car)?

Up to 22 kW AC via Type 2.

### How many charging sockets does Tedco Business Centre, Ne32 3DT (Charge Your Car) have?

2 charging sockets: 2 × 22 kW Type 2.

### Who operates Tedco Business Centre, Ne32 3DT?

Tedco Business Centre, Ne32 3DT is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at Tedco Business Centre, Ne32 3DT (Charge Your Car)?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in Jarrow](https://ampmap.co.uk/chargers/united-kingdom/south-tyneside/jarrow)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [South Tyneside Homes Viking Industrial Estate · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-south-tyneside-homes-viking-industrial-estate-2-uk) - CCS 50 kW, CHAdeMO 50 kW · Estatees
- [The Eco Centre · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-the-eco-centre-uk) - Type 2 7 kW · The Eco Centre
- [South Tyneside Homes Viking Industrial Estate · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-south-tyneside-homes-viking-industrial-estate-uk) - Type 2 7 kW · 11
- [Jarrow Station Car Park 2 · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-jarrow-station-car-park-2-uk) - Type 2 7 kW · Station Street
- [Tyne Street Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-tyne-street-car-park-uk) - Type 2 7 kW · Tyne Street Car Park
- [Morrisons Jarrow](https://ampmap.co.uk/charger/morrisons-jarrow-uk) - Type 2 22 kW · Monkton Road

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-tedco-business-centre-ne32-3dt-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 12 Sept 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
