# The Dunes Entertainment Centre · Charge Your Car

Web page: https://ampmap.co.uk/charger/charge-your-car-the-dunes-entertainment-centre-uk

The Dunes Entertainment Centre is an EV charging site in South Shields, South Tyneside, run by Charge Your Car. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and charging is listed as free.

## Status

We don't have live status for this charger. Check it when you arrive.

## Location

- **Address:** Pierhead Car Park, Sea Road, NE33 2LD
- **Area:** South Shields, South Tyneside, United Kingdom
- **Coordinates (latitude, longitude):** 55.00237, -1.41876

## Connectors and prices

| Connector | Power | Sockets | Price per kWh |
| --- | --- | --- | --- |
| CCS | 50 kW | 1 | Not listed |
| CHAdeMO | 50 kW | 1 | Not listed |
| Type 2 | 43 kW | 1 | Not listed |

- **Price:** Free (from Open Charge Map)

## Site information

- **Operator:** Charge Your Car
- **Opening hours:** Not published
- **Access:** Public · membership required · access key required

## Common questions

### How much does it cost to charge at The Dunes Entertainment Centre (Charge Your Car)?

The listed price is Free. Prices can change, so check the price at the charger before you start.

### How fast is charging at The Dunes Entertainment Centre (Charge Your Car)?

Up to 50 kW DC via CHAdeMO, Type 2, CCS.

### How many charging sockets does The Dunes Entertainment Centre (Charge Your Car) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 43 kW Type 2, 1 × 50 kW CCS.

### Who operates The Dunes Entertainment Centre?

The Dunes Entertainment Centre is on the Charge Your Car network.

### How long does a Tesla Model Y Long Range take to charge at The Dunes Entertainment Centre (Charge Your Car)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Dunes Entertainment Centre (Charge Your Car)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

### How long does an Audi Q4 e-tron 50 take to charge at The Dunes Entertainment Centre (Charge Your Car)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

## Explore the area

- [More chargers in South Shields](https://ampmap.co.uk/chargers/united-kingdom/south-tyneside/south-shields)
- [Charge Your Car chargers](https://ampmap.co.uk/networks/charge-your-car)

## Chargers near this site

- [Pierhead Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-pierhead-car-park-uk) - Type 2 7 kW · Pierhead Car Park
- [Pier Parade Car Park · MER](https://ampmap.co.uk/charger/mer-pier-parade-car-park-uk) - Type 2 7 kW · Pier Parade Car Park
- [Pier Parade Car Park · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-pier-parade-car-park-uk) - CHAdeMO 50 kW, Type 2 50 kW · Pier Parade Car Park
- [Ocean Road 1 · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-ocean-road-1-uk) - Type 2 7 kW · Ocean Road Car Park
- [South Promenade South · MER](https://ampmap.co.uk/charger/mer-south-promenade-south-uk) - Type 2 7 kW · South Promenade South Car Park
- [Beacon Street · Charge Your Car](https://ampmap.co.uk/charger/charge-your-car-beacon-street-uk) - Type 2 7 kW · Beacon Street

## Links

- [This charger as JSON, with live socket status](https://ampmap.co.uk/api/chargers/charge-your-car-the-dunes-entertainment-centre-uk)
- [Use Amp Map in an AI assistant](https://ampmap.co.uk/assistants)

---

Data: Open Charge Map (verified 3 Oct 2019).

Third-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.

Always check directly with the charge point operator for the most up-to-date information.
