Charge Your Car · EV charging site
The Nook , South Tyneside
The Nook, South Shields, NE34 8PS
The Nook , South Tyneside is an EV charging site in South Shields, South Tyneside, run by Charge Your Car. Both of its sockets are 7 kW Type 2, and charging is listed as free. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is N/A (Charge Your Car), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Charge Your Car
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- Free(from Open Charge Map, 30 Oct 2018)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Nook , South Tyneside (Charge Your Car)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at The Nook , South Tyneside (Charge Your Car)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Nook , South Tyneside (Charge Your Car) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates The Nook , South Tyneside?
The Nook , South Tyneside is on the Charge Your Car network.
Where is the nearest charger with 50 kW or more to The Nook , South Tyneside (Charge Your Car)?
N/A (Charge Your Car) is 1.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Nook , South Tyneside (Charge Your Car)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Nook , South Tyneside (Charge Your Car)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Nook , South Tyneside (Charge Your Car)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- N/A · 50 kW · 1.2 mi