Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

BP Pulse · EV charging site

Toton Lane Tram park & ride

Toton Lane Tram park & ride, 320 Toton Lane, Stapleford, NG9 7JB

Toton Lane Tram park & ride is an EV charging site in Stapleford, Nottinghamshire, run by BP Pulse. Its 11 sockets reach up to 50 kW, with CCS and CHAdeMO at the top speed, and published prices run from £0.65 to £0.89 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 57% uptime and recorded 19 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is TOTON PARK & RIDE (BP Pulse), 60 yards away.

Status

7 of 11 available

Checking status…

VerifiedLive status and details from BP Pulse’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS or CHAdeMO or Type 2 · 50 kW1 connector · 89p per kWhOut of service
2448154% reliabilityOut of order
Type 2 · 7 kW8 connectors · 65p per kWh5 free3 out of service
108440% reliabilityOut of order
11034100% reliabilityAvailable
110350% reliabilityOut of order
110350% reliabilityOut of order
1103694% reliabilityAvailable
1103694% reliabilityAvailable
11037100% reliabilityAvailable
11037100% reliabilityAvailable
Type 2 · 4 kW2 connectors · 65p per kWh2 free
11038100% reliabilityAvailable
11038100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
BP Pulse
Opening hours
Not published
Payment
In the BP Pulse appRFID card
Charger ID
10844

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS50 kW89p per kWh
CHAdeMO50 kW89p per kWh
Type 244 kW89p per kWh
Type 27 kW65p per kWh
Type 24 kW65p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min · ≈ 55 kWh · ~£49
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min · ≈ 40 kWh · ~£36
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min · ≈ 51 kWh · ~£45
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min · ≈ 51 kWh · ~£45
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min · ≈ 43 kWh · ~£38
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min · ≈ 41 kWh · ~£36
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£25

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Toton Lane Tram park & ride (BP Pulse)?

The listed price is Type 2 £0.65/kWh · CCS £0.89/kWh · CHAdeMO £0.89/kWh · Type 2 £0.89/kWh · Type 2 £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Toton Lane Tram park & ride (BP Pulse)?

Up to 50 kW DC via Type 2, CCS, CHAdeMO.

How many charging sockets does Toton Lane Tram park & ride (BP Pulse) have?

11 charging sockets: 8 × 7 kW Type 2, 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 44 kW Type 2, 2 × 4 kW Type 2. Live per-socket availability is shown on this page.

When is Toton Lane Tram park & ride (BP Pulse) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Toton Lane Tram park & ride (BP Pulse)?

Amp Map measured 57% uptime here from recorded live status over the last 30 days, across 19 observed charging sessions.

Who operates Toton Lane Tram park & ride?

Toton Lane Tram park & ride is on the BP Pulse network.

Where is the nearest other charger with 50 kW or more to Toton Lane Tram park & ride (BP Pulse)?

TOTON PARK & RIDE (BP Pulse) is 60 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Toton Lane Tram park & ride (BP Pulse)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Toton Lane Tram park & ride (BP Pulse)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Toton Lane Tram park & ride (BP Pulse)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: BP Pulse · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.